Tamakoshi V HEP, 99.8 MW

Nepal
Detailed Engineering Design and Tender Document Preparation of Tamakoshi V HEP, 99.8 MW
Solutions associées
Eau

Detailed Engineering Design and Tender Document Preparation of Tamakoshi V HEP, 99.8 MW

Tamakoshi V Hydroelectric Project is of 99.8 MW installed capacity and located approximately 170 km northeast of Kathmandu, the capital of Nepal and approximately 40 km away from the district head-quarter of Dolakha District- Charikot Bazaar. This project is conceptualized to develop as a tandom operation project with Upper Tamakoshi HEP. The intake site / underground interconnection system with Upper Tamakoshi tailrace outlet is located in Lamabagar VDC at an elevation of 1155.02 masl whereas the underground powerhouse lies at the right bank of Tamakoshi River just downstream of the Suri River confluence with Tamakoshi River.

Client Tamakoshi Jal Vidhyut Company Ltd.
Emplacement Dolakha, Nepal
Période January 2017 to June 2021
Capacité 99.8 MW

Services Provided

Sous-domaines utilisés

Introduction aux sous-domaines utilisés
Grands aménagements hydroélectriques

Références liées