New LNG bunkering facility. The building of the first permanent liquefied natural gas bunker station in a European inland port is proceeding to plan.
Client | Confidential |
---|---|
Emplacement | Cologne, Germany |
Période | 2017 |
Capacité | Gross 100m³ storage capacity LNG Truck loading (300 l/min); LNG Ship loading (300 l/min); CNG 650 kg/h |
Technical support during permitting phase including: