Belo Monte is located in the Xingu River, in the municipality of Vitória do Xingu, State of Pará, North Region of Brazil. With 11,233 MW, it will be the country’s second largest hydropower plant.
e-methane production from green H2 and CO2 captured from an incinerator.
Pre-Feasibility Study