This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Integrated value chain from renewable energy to LOHC.
Technical Due diligence PV and Wind
Pre-Feasibility Study (Prosumer Sizing)
Feasibility Study