This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Developing beyond state-of-the-art software tools on energy transition topics to deliver high added value studies, like PACA 100 project