Tihange Nuclear Power Plant Safety Improvement

Belgium
Solutions associées
Nucléaire

After a Periodic Safety Review and the earthquake event at Fukushima Daiichi in Japan, ENGIE Electrabel decided to improve the protection of Tihange nuclear power plant against external flooding. Tractebel was hired to study, develop and implement the construction of the technical solutions related to the successive and independent external flooding protections. 

Client ENGIE Electrabel
Emplacement Tihange
Période 2010 - 2015

Services provided

Architect Engineering (EPCM)

Sous-domaines utilisés

Introduction aux sous-domaines utilisés
Modifications et modernisations de centrales Évaluation de la sécurité