Vermio complex, with an aggregated installed capacity of 46.2 MW is sponsored by Terna Energy S.A., a subsidiary of GEK Terna Group. The complex consists of two neighbouring wind farms: the 37.8MW Eressou Ypsoma – Fourka wind farm (capped at 36MW due to licensing restrictions) and the 8.4MW Lefkes – Kerasia wind farm. Both wind farms were connected to the new constructed substation ”Georgianoi”.

Client Euopean Investment Bank
Emplacement Vermio, Greece
Période 2017-2020
Capacité 46.2 MW