This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Basic Design and Environmental Impact Assessment of six cogeneration units 500/4000 MWe in Italy and Turkey