The new lock at Ivoz Ramet on the river Meuse in Belgium is part of the development of the trans-europe network of waterways.
Client | Ministère de l'Equipement et des Transports Direction générale des Voies Hydrauliques |
---|---|
Emplacement | Ivoz-Ramet, Flemalle, Belgium |
Période | 2007 - 2013 |
Conceptual and detailed design related to :
-civil engineering
-electromechanical equipment
Construction supervision