This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
Power plant to provide back-up, on-demand capacity for the region in case of high demand.
Owner’s Engineer
Configuration