Jirau Hydropower Plant

Brazil
Solutions associées
Eau
Villes et territoires

The Jirau Hydropower Plant is situated on the Madeira River, in the State of Rondônia, Northern Brazil. The fully operational plant has an installed capacity of 3,750 MW, enough to serve approximately 10 million homes. After 90 months of construction, it was officially inaugurated in December 2016. From the outset, Tractebel has been closely involved in all aspects of the project in close collaboration with the client.

Client ESBR (ENGIE, Mitsui, Eletrobras Eletrosul, CHESF)
Emplacement Madeira River, Brazil
Période 2008-2017
Capacité 3,750 MW

Services provided

hydro-jirau-brazil-engiehydro-jirau-vista-geral-brazil-2hydro-jirau-vista-geral-brazilhydro-jirau2-brazil-engiehydro-jirau3-brazil-engiejirau-hydro-brazil-1

Sous-domaines utilisés

Introduction aux sous-domaines utilisés
Grands aménagements hydroélectriques Conseil en gestion des impacts environnementaux et sociaux  Equipement hydro-électromécanique Etudes d’impact environnementale et sociale et limitation des effets Ingénierie géotechnique et travaux souterrains Conseil en gestion des impacts environnementaux et sociaux  Conseil en gestion des impacts environnementaux et sociaux