This project encompasses a ±500 kV direct current power transmission line (> 1,000 km), the construction of two substations, two ground electrode stations and connection of the 400 kV AC substations to the national power grids.
In operation since 2015, the power produced is transported through cables that Tractebel helped installing.
Consultancy Services inner array cables