This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Feasibility study and implementation study of a new LNG jetty of the LNG terminal in Zeebruges.
Phase I: Feasibility study
Phase II: Implementation study